Select a system to inspect.
22 systems × CDE scope classification (in-CDE / connected / out-of-scope). Per system: PAN/CHD touchpoints, segmentation evidence, segmentation test, control owner. Surfaces 2 scope-leaked systems + 1 missing annual segmentation test.